Personal Observation of Infrastructure survey of FALLANGANI NAVAJYOTI HIGH SCHOOL :---- There is a boundary wall in the front of school only about 50 metre. The condition of the existing main building is not good conditions. The walls and floor were broken in several places and the the doors,doorframes, windows and window frames were almost damaged. The tins of the roof are also almost damaged. The highland area of vacant land suitable for construction is 1.6 bigha. Munindra Gogoi (Asst Teacher - Balijan Sanakarjyoti High School) ...
Posts
Showing posts from August, 2022